It is the total capacity of the pool for each period.
It is sum of capacity of resources with allocation rate.
Ok thanks, i have understand, but why in my screen shot i have only one ETP for each period ? The main problem is , for this case on planification i have only one ETP available.
Please show print screen for resources.
Hello,
Thanks for answer, please find in attachement a word file with all screen shots with the all ressources in the pool.
Thanks for your answer because all planning calcultion are wrong, i think because only one ressource are included in the pool (not all)
Bruno.
OK.
I could reproduce.
Ticket #4571 recorded
PErfec on V8.4.2. Thanks !