Hi all,

I tested version 3.01 and I have put together a display problem Gant charts. If I do not select a project by project it is impossible to visualize the overall schedule. Configuration variable to the maximum number is set to 30 and I must have 25 activities on projects that are not displayed. I did the test by emptying the cache on both browsers.
The icon turns waiting a very long time (30s) then the page is empty:

The page works projects with 10 activities.

I hope that this problem will be solved, because I unfortunately went into production with version 3.00 🙁 that it works at display Gant with many more projects.

Thank you for your help, if you need more info do not hesitate.


 
Posté : 2 Déc PM 12:1212
(@babynus)
Posts: 14952
Membre Admin
 

Could you check if on of your projects or activities name has a " (double quote) ?
If yes : try and replace it with ' (single quote).
If it fixes issue, then it is a bug that is fixed on V3.0.2.


 
Posté : 2 Déc PM 15:1212
(@f-cheminade)
Posts: 26
Active Member
Début du sujet
 

Thank you for the correction.

Strongly that the version 3.0.2 so it seems to fix a lot of small problems 🙂 .

Thank you.


 
Posté : 2 Déc PM 17:1212