Hi Babynus,
Something strange that happends for the first time since I use ProjeQtOr (since 2011, october).
In Real work allocation screen, when I write 0.25 and save it, that is correct. The sum of the day is 1.
But after refreshing the screen, the value is changed to 0.5 and the sum of the day is 1.25, which is wrong.
How is it possible ?
I try to correct this value, but even after saving, submitting, validating work, it's always change to 0.5.
I don't understand...
Do you have an idea ?
Thanks
Fred