[SOLVED] Left work with manual planning in activity

3 Posts
2 Users
0 Reactions
2,271 Views
(@brunof782)
Posts: 45
Active Member
Topic starter
 
[#7053]

Hello,

i'm kind of stuck with an activity :

This activity has with 0.25 of work left. The manager of this task wants to close it, so he want's to get rid of the 0.25 left.

When editing the assignation, i can't find how to erase this time left. If i click on the 0.25 left it replaces it by a full day (This is what i've done in the capture).

Thanks for your help.


 
Posted : 19 Nov 2020 13H33
babynus
(@babynus)
Posts: 14954
Main Contributor Admin
 

You must go to the Timesheet and change left work to zero


 
Posted : 20 Nov 2020 10H50
(@brunof782)
Posts: 45
Active Member
Topic starter
 

thanks, it worked perfectly.


 
Posted : 23 Nov 2020 10H21