In same way of 45° curve , it would be possible to fix the reference planning at T0 of the projet before "today date".
Validated workload shall be fix in the past ...
This is not an issue with 45° grash but with baseline.
Already recorded as Ticket #2405
[Acceptance review 6.0.3] : Ok . Now is possible to fix a planning in the past. You're right, is not a 45°curve issue but a baseline configuration issue. To fix a planning in the past is possible only if there are not baseline already fix.