Hello,
Issue I've encountered:
- Parameter "consolidate validated work" = 'Always'
- create an activity, validated work = 10d
- add an assignment, assign 1d to team member
=> the validated work becomes 0
I would expect the validated work value to remain 10d (this is on the lowest level of Activity).
Posted : 23 Nov 2017 19H09
Issue confirmed are recorded as Ticket #3100
Posted : 25 Nov 2017 4H19