Forum

Welcome to ProjeQtOr new Forum. We migrated old forum to the new website.
You will find all your posts here, with your usual account.
Just one point : you’ll have to reinitialize your password. Use “Lost password” feature.

Left Work Tickets
 
Notifications
Clear all

Left Work Tickets

7 Posts
3 Users
0 Reactions
7,313 Views
(@durou-c)
Posts: 468
Contributor
Topic starter
 
[#4646]

if I put 2h on estimated work, I put 1h on real work, then left work is 1h... How I can put the left work at 0, without changing estimated work ?


 
Posted : 19 Sep 2017 16H43
(@mehdiz)
Posts: 6
Active Member
 

Hello dep@eca.fr,
If you want to put the left work at 0 you need to change ticket status. In my workflow I need to change status to done because if there is no left work remains, this ticket is done and Projeqtor puts 0 to leftwork.


 
Posted : 19 Sep 2017 16H56
(@durou-c)
Posts: 468
Contributor
Topic starter
 

If I w


 
Posted : 19 Sep 2017 17H27
(@durou-c)
Posts: 468
Contributor
Topic starter
 

If I want to to change status to done with left work, I have an error message: "Left work is not null, delete left work before passing this element in a done status"

but I cannot change the value of Left work case...

How I can do that ?


 
Posted : 19 Sep 2017 17H29
(@mehdiz)
Posts: 6
Active Member
 

Please verify that you have unchecked option "no left work on done". You can find it into parameters/list of types/ticket types (like the attachement).


 
Posted : 19 Sep 2017 17H40
(@durou-c)
Posts: 468
Contributor
Topic starter
 

yes "no left work on done" is checked, I need this check, because I don't want that somebody could done a ticket with left work, but If the job has been made more quickly than the estimated, I would like to be able to put the rest to 0, as on the activities.


 
Posted : 19 Sep 2017 17H58
babynus
(@babynus)
Posts: 14966
Main Contributor Admin
 

If you keep parameter "no left work on done", you must change estimated to be equal to real to set left to zero.
If you remove parameter "no left work on done", you can move to done status, this will automatically set left to zero.


 
Posted : 20 Sep 2017 19H41
Share:

Scroll to Top