Hi,
I'm knew to Projeqtor and I'm having troubles to close meetings. I search the forum but didn't find an answer, sorry if I missed it.
My problem is that I can only move the status to "Validated". I'd like to move it to "Closed" so that it doesn't appear in the "Real work allocation" tab anymore.
I tried in the demo by creating a meeting for the SGB project on january the 1th.
I moved it to validated but can't go further.
What am I missing or doing wrong.
Thanks for the answer.
Good Morning
You need to check that it does not you have time, otherwise it is impossible to close a stain or other with the rest
---------------------------------------------------------------
Bonjour
Vous devez vérifier qu'il ne vous reste pas du temps, sans quoi il est impossible de fermer une tache ou autre avec du reste
http://www.vkv.iea45.fr/
Hi,
Thanks for your answer but I have no time left.
As you can see in the demo, I have 0,25 assigned, 0,25 real and 0,00 left.
I still can't close the meeting. 🙁
Hi,
It is just because the workflow does not allow to go further than validated...
On the Demo, I changed the worlflow used by meetings (simple with preparation) to be able to go from validated to closed.
You should now be able to close meetings on the demo.
Heeeeeeeeeee :huh:
Silly me didn't think of that ^^ :blink:
It's working !
Thank you very much. :cheer: :cheer: :cheer:
changed the worlflow used by meetings 🙂 🙂