New Report / Nouveau Rapport

10 Posts
2 Users
0 Reactions
10.4 K Views
VAUCHEY
(@protion)
Posts: 138
Active Member
Topic starter
 
[#2106]

Hello
I wonder if it would be possible to have a new report, which would be identical to synthesis of load activity, but with the added ability to do that on a team or resource, see what is the simplest.
To see the possible overruns person based stains
Thank you in advance
--------------------------------------------------------------------------------------
Bonjour
Je voudrais savoir si il serait possible d'avoir un nouveau rapport, qui serait identique a synthèse des charge par activité, mais avec en plus la possibilité de le faire que sur une équipe ou une ressource, voir ce qui est le plus simple.
Afin de voir les possibles dépassement des personne en fonction des taches
Merci d'avance


http://www.vkv.iea45.fr/

 
Posted : 24 Nov 2014 16H25
babynus
(@babynus)
Posts: 14966
Main Contributor Admin
 

"synthesis of load activity"

=> do you mean "work synthesis per activity" ?

What do you mean with

do that on a team or resource

Limit to activities assigned to single resource or resources of given team ? or something else ?


 
Posted : 24 Nov 2014 21H32
VAUCHEY
(@protion)
Posts: 138
Active Member
Topic starter
 

The goal is to have the details of each contract activities (by month or by year) for a resource.
This with the same layout as the report "Synthesis of load activity"
----------------------------------------------
Le but est d'avoir le détail de chaque activités par contract ( par mois ou par années) pour une ressource.
Cela avec la même présentation que le rapport "synthèse des charge par activité"


http://www.vkv.iea45.fr/

 
Posted : 24 Nov 2014 22H10
babynus
(@babynus)
Posts: 14966
Main Contributor Admin
 

I still don't undestrand your need.
The report you mention is not able to give detail by month or by year, but on complete project scope.
Some reports already exist to give visibility by month or by year, and several can be displayed on team scope.
Please explain.


 
Posted : 24 Nov 2014 23H45
VAUCHEY
(@protion)
Posts: 138
Active Member
Topic starter
 

I wish I had the opportunity to see for a resource (scale of one month or year) all the close and ongoing task, with details of the assigned time and real time.
------------------------------------------------------------------------------------------------------------------------------------------
Je voudrais avoir la possibilité de voir pour une ressource (à l'échelle d'un mois ou de l'année) l'intégralité des tache close et en cours, avec le détail du temps assigné et du temps réel.


http://www.vkv.iea45.fr/

 
Posted : 25 Nov 2014 11H16
babynus
(@babynus)
Posts: 14966
Main Contributor Admin
 

Your request is not consistent.
You cannot see assigned work on a month (or other scale) as assigned work is not time dependant.
Really, I don't catch what you expect.
Maybe if you can provide a template it could help.


 
Posted : 25 Nov 2014 11H48
VAUCHEY
(@protion)
Posts: 138
Active Member
Topic starter
 

ok


http://www.vkv.iea45.fr/

 
Posted : 25 Nov 2014 12H06
VAUCHEY
(@protion)
Posts: 138
Active Member
Topic starter
 

Here I would like to summarize, month or year but with the possibility of having the resource detail
------------------------------------------------------------------------
Voila je voudrais une synthèse, sur un mois ou l'année mais avec la possibilité d'avoir le détail par resource


http://www.vkv.iea45.fr/

 
Posted : 25 Nov 2014 12H26
babynus
(@babynus)
Posts: 14966
Main Contributor Admin
 

Hi,

What you show in attached image cannot be done on a month or year scope.
Only Real work can be summed up on a given month or year.
Validated, Assigned, Planned and Left work cannot. They are define for an activity or assignment, but without any date.

So summing up reald work for a mont or year, for a given resource correspond to existing work summary reports.


 
Posted : 25 Nov 2014 13H13
VAUCHEY
(@protion)
Posts: 138
Active Member
Topic starter
 

Ok no problème


http://www.vkv.iea45.fr/

 
Posted : 25 Nov 2014 13H27