Hi there,
I was checking with ProjeQtOR version 12.0.0 for timesheet: dispatch entry and then checked for report: list of works for an activity, it looks that hour units are showing not as entered in timesheet, in my case I had entered 1 hour each for two jobs, report is showing value 1/8 and also not showing total at the end. Please refer to the attachment.