When a project has sub projects or sub projects with a diferent category, the report calculate 1 KPI for each sub project.
It is important to have a consolidated view of the indicator "workload" for each sub project and for the master project.
Thanks,
Pascal
Posté : 1 Mar PM 18:033
Début du sujet
I have a mistake, the ticket can be closed..