About Calculate Capacity Planning

Hello, All resource allocations are being handled by Projeqtor, therefore if there are already tasks during the same period of a resource, they may b...

Il y a 5 ans
Sujet
Replies: 4
Views: 1669
Sujet
Replies: 1
Views: 1739
Répondre
After V8.4.2. Planned Dates Problem

Hello again, I spotted that the problem might be related to "not splitted work", because when i disabled that option of an activity, its planned date...

Il y a 6 ans
Sujet
Replies: 2
Views: 1800
Répondre
Répondre
After update to :V8.4.1. unable to Import Data

After update to the last version, import data utility has stopped functioning properly. First, i tried to import my activity list by selecting "acti...

Il y a 6 ans
Sujet
Replies: 4
Views: 5666
Sujet
Il y a 7 ans
Replies: 1
Views: 2140
Répondre
Resource Types

The problem with resource pool is related with capacity (FTE) setting. For example, when i create a pool comprising of two resources, i leave FTE at 1...

Il y a 7 ans
Répondre
Resource Types

Again thanks a lot for your reply. And just think of me in this situation. 🙂 Assign a type of resource to a type of activity, and another same typ...

Il y a 7 ans
Répondre
Resource Types

Thank you very much for your quick reply. It is not necessary to be an AI solution. I think the program has already existing algorithms for this. Aft...