Project visibility not the same in "Today" and in "Project" view

yes !!!! Looks like !!! I now understand. thanks so much I turned almost crazy :silly:

Il y a 10 ans
Répondre
Project visibility not the same in "Today" and in "Project" view

here it is Issue_Project_visibility_by_project_leader-2.pdf

Il y a 10 ans
Répondre
Project visibility not the same in "Today" and in "Project" view

Please see screen shots attached. Again, the difficulty is that it is not systematic to all projects. In all cases: project leaders can see there pro...

Il y a 10 ans
Répondre
Project visibility not the same in "Today" and in "Project" view

Thanks. Even in that case the project leader can only consult the data of the project and can not modify it although he should (because he is the proj...

Il y a 10 ans
Répondre
Project visibility not the same in "Today" and in "Project" view

4 => I did but unfortunately the situation is the same. 5 => yes project leaders did disconnect / reconnect several times 6 => no message i...

Il y a 11 ans
Répondre
Project visibility not the same in "Today" and in "Project" view

Hi, Thanks for your hints. 1 => yes access permission is correct (default proposed by Projeqtor) 2=> I am not sure to understand this point. ...

Il y a 11 ans
Sujet
Répondre
[SOLVED] Unable to assigne same person twice to same project with different rates

Thanks for your answer. Investigation on my side: this index was set by the installation of another product (KAnban) linked with Projeqtor. Issue ...

Il y a 11 ans
Sujet
Replies: 1
Views: 3691
Répondre
How to reflect the change in the cost of a resource

I think I understood the way it works. In my example: 1/ When I assign the resource => assigned cost = 40 * 100 EUR (daily cost of resource ...

Il y a 11 ans
Répondre
How to reflect the change in the cost of a resource

Thanks for your answer. In that case I face an issue because even when I run planning calculation, the planned cost uses the last value of cost / day ...

Il y a 11 ans